হোম / নির্দেশিকা

সরকারি নথি ও সূত্র

Official documents and sources

Retail tariff table · June 2026 ↗

DPDC · Official LT/MT/HT/EHT retail tariff tables; flat/TOU energy and demand-rate columns

verified · 2026-11-02

Official indexed tariff table. No claim that all later amendments have been excluded.

Retail tariff gazette · February 2024 ↗

Government of Bangladesh / NESCO official copy · Gazette page 1914: LT-A and LT-E; page 1922: prepaid conditions

verified · 2026-11-01

Historical schedule; do not apply to June 2026 onward.

Retail tariff order · 3 June 2026 ↗

BERC · Original PDF; page-level visual verification pending

verification-required · 2026-11-02

Official BERC-hosted order. PDF page-level visual verification is pending; its retail schedule was independently cross-checked against the official DPDC tariff table.

Retail tariff correction notice · 4 June 2026 (official BERC page) ↗

BERC · BERC notice page verified; attached single-page correction PDF not yet visually checked

Notice page verified; attachment review pending · 2026-11-02

The official notice listing is verified; the correction details in its PDF attachment have not been independently read.

Prepaid consumer FAQ ↗

DESCO · Monthly extra deduction / daily and monthly consumption questions

conflicting · 2026-11-01

Bangla and English first-slab figures differ; not used to set rates, rebate or universal meter codes.

Unified and non-unified prepaid meter guides ↗

DPDC · Consumer guide listing

verification-required · 2026-11-01

Exact model mapping and instructions require original manual inspection.

Prepaid meter user manual ↗

NESCO · Short-code table; exact model mapping unresolved

conflicting · 2026-11-01

Indexed table repeats code 07 for different meanings. Codes withheld until visual and model verification.

Short Codes for DESCO Button Meters ↗

DESCO · Code 814: Total forward active energy for current month

verified · 2026-11-01

Official indexed code table. Scope: DESCO button meters; exact model mapping not established. Direct fetch timed out; no universal manufacturer claim.

Smart prepaid guide: current-month energy code ↗

NESCO · Short-code table: 400, current-month total consumed electricity (kWh)

verified · 2026-11-01

Official indexed table explicitly identifies 400 as current-month kWh. Exact model mapping and PDF page remain unresolved. Separate ambiguity in code 07 does not establish the meaning of other codes. Direct PDF fetch returned 403.

Pre-Payment Metering System: Meter Short Code ↗

BPDB · Meter Short Code, row 12 Current Month Uses; Hexing, Linyang and Eastern columns

verified · 2026-11-01

Official indexed brand-column references, not exact-model verification. Inhe omitted because phase column mapping needs inspection. Historical fee examples on the same page are not adopted.

Hexing three-phase keypad meter manual ↗

DPDC · Short-code table, code 814: current-month electricity use; two-page manual

verified · 2026-11-01

Official DPDC-hosted PDF resolves. Indexed table explicitly supports 814. Scope: Hexing three-phase keypad manual; no claim for every DPDC meter/model/phase.

Hexing meter codes ↗

WZPDCL · Digholia office · Hexing meter code table: 814, current-month electricity used (units)

verified · 2026-11-01

Official local utility page, content updated 2024-10-15. Indexed table checked. Scope: published Hexing list; exact model mapping remains unresolved.

Prepayment meter short-code list ↗

Narayanganj Palli Bidyut Samity-1 · Short-code table: 814, current-month used electricity (units)

verified · 2026-11-01

Official PBS-1 indexed table, content updated 2023-01-27; direct fetch returned 502. Local reference only, not verified for every BREB/PBS deployment.

Control room and distribution-utility complaint contacts ↗

Power Division · Published helpline numbers and complaint escalation

verified · 2026-11-02

Official Power Division contacts page; the page states its content was updated 16 September 2026.

Net Metering Guideline · 2025 ↗

Power Division / SREDA · Sections 3.4–3.6: billing, settlement, charges and meters

verified · 2026-11-02

Official guideline PDF hosted on the Power Division net-metering site.

Net Energy Metering · official FAQ ↗

Power Division · Eligibility, approvals, settlement and billing questions

verified · 2026-11-02

Official FAQ; individual application and settlement conditions remain subject to the current guideline and distribution utility.

New connection · DESCO official service ↗

DESCO · Connection documents; provider example only

verified · 2026-11-02

Official DESCO checklist. Not a nationwide fee list or requirements for other utilities.

Internal e-services directory ↗

DESCO · New connection, prepaid and bill-payment service listings

verified · 2026-11-02

Official service directory; it routes users to DESCO services and does not define other utilities’ rules.

Sustainable and Renewable Energy Development Authority ↗

SREDA · Energy efficiency and renewable-energy resources

verified · 2026-11-02

Official authority portal; appliance watts-to-units formula on this site is an estimate, not a utility rule.

Retail tariff correction · official PDF · 4 June 2026 ↗

BERC / Government of Bangladesh · Single-page correction PDF; page-level visual/text verification pending

verification-required · 2026-11-02

Official PDF retained for direct reference. Do not attribute any specific numerical rule to this link until the page is inspected.

পরিকল্পনার ক্যালকুলেটর / Planning calculators →

মূল হিসাবে ফিরুন / Back to the bill calculator →

বিদ্যুৎ বা বিল নিয়ে সমস্যা?

সরকারি সূত্র / Government reference: Power Division · Control room and published hotline contacts · page updated 16 September 2026 ↗