সরকারি নথি ও সূত্র
Official documents and sources
Retail tariff table · June 2026 ↗
DPDC · Official LT/MT/HT/EHT retail tariff tables; flat/TOU energy and demand-rate columns
verified · 2026-11-02
Official indexed tariff table. No claim that all later amendments have been excluded.
Retail tariff gazette · February 2024 ↗
Government of Bangladesh / NESCO official copy · Gazette page 1914: LT-A and LT-E; page 1922: prepaid conditions
verified · 2026-11-01
Historical schedule; do not apply to June 2026 onward.
Retail tariff order · 3 June 2026 ↗
BERC · Original PDF; page-level visual verification pending
verification-required · 2026-11-02
Official BERC-hosted order. PDF page-level visual verification is pending; its retail schedule was independently cross-checked against the official DPDC tariff table.
Retail tariff correction notice · 4 June 2026 (official BERC page) ↗
BERC · BERC notice page verified; attached single-page correction PDF not yet visually checked
Notice page verified; attachment review pending · 2026-11-02
The official notice listing is verified; the correction details in its PDF attachment have not been independently read.
Prepaid consumer FAQ ↗
DESCO · Monthly extra deduction / daily and monthly consumption questions
conflicting · 2026-11-01
Bangla and English first-slab figures differ; not used to set rates, rebate or universal meter codes.
Unified and non-unified prepaid meter guides ↗
DPDC · Consumer guide listing
verification-required · 2026-11-01
Exact model mapping and instructions require original manual inspection.
Prepaid meter user manual ↗
NESCO · Short-code table; exact model mapping unresolved
conflicting · 2026-11-01
Indexed table repeats code 07 for different meanings. Codes withheld until visual and model verification.
Short Codes for DESCO Button Meters ↗
DESCO · Code 814: Total forward active energy for current month
verified · 2026-11-01
Official indexed code table. Scope: DESCO button meters; exact model mapping not established. Direct fetch timed out; no universal manufacturer claim.
Smart prepaid guide: current-month energy code ↗
NESCO · Short-code table: 400, current-month total consumed electricity (kWh)
verified · 2026-11-01
Official indexed table explicitly identifies 400 as current-month kWh. Exact model mapping and PDF page remain unresolved. Separate ambiguity in code 07 does not establish the meaning of other codes. Direct PDF fetch returned 403.
Pre-Payment Metering System: Meter Short Code ↗
BPDB · Meter Short Code, row 12 Current Month Uses; Hexing, Linyang and Eastern columns
verified · 2026-11-01
Official indexed brand-column references, not exact-model verification. Inhe omitted because phase column mapping needs inspection. Historical fee examples on the same page are not adopted.
Hexing three-phase keypad meter manual ↗
DPDC · Short-code table, code 814: current-month electricity use; two-page manual
verified · 2026-11-01
Official DPDC-hosted PDF resolves. Indexed table explicitly supports 814. Scope: Hexing three-phase keypad manual; no claim for every DPDC meter/model/phase.
Hexing meter codes ↗
WZPDCL · Digholia office · Hexing meter code table: 814, current-month electricity used (units)
verified · 2026-11-01
Official local utility page, content updated 2024-10-15. Indexed table checked. Scope: published Hexing list; exact model mapping remains unresolved.
Prepayment meter short-code list ↗
Narayanganj Palli Bidyut Samity-1 · Short-code table: 814, current-month used electricity (units)
verified · 2026-11-01
Official PBS-1 indexed table, content updated 2023-01-27; direct fetch returned 502. Local reference only, not verified for every BREB/PBS deployment.
Control room and distribution-utility complaint contacts ↗
Power Division · Published helpline numbers and complaint escalation
verified · 2026-11-02
Official Power Division contacts page; the page states its content was updated 16 September 2026.
Net Metering Guideline · 2025 ↗
Power Division / SREDA · Sections 3.4–3.6: billing, settlement, charges and meters
verified · 2026-11-02
Official guideline PDF hosted on the Power Division net-metering site.
Net Energy Metering · official FAQ ↗
Power Division · Eligibility, approvals, settlement and billing questions
verified · 2026-11-02
Official FAQ; individual application and settlement conditions remain subject to the current guideline and distribution utility.
New connection · DESCO official service ↗
DESCO · Connection documents; provider example only
verified · 2026-11-02
Official DESCO checklist. Not a nationwide fee list or requirements for other utilities.
Internal e-services directory ↗
DESCO · New connection, prepaid and bill-payment service listings
verified · 2026-11-02
Official service directory; it routes users to DESCO services and does not define other utilities’ rules.
Sustainable and Renewable Energy Development Authority ↗
SREDA · Energy efficiency and renewable-energy resources
verified · 2026-11-02
Official authority portal; appliance watts-to-units formula on this site is an estimate, not a utility rule.
Retail tariff correction · official PDF · 4 June 2026 ↗
BERC / Government of Bangladesh · Single-page correction PDF; page-level visual/text verification pending
verification-required · 2026-11-02
Official PDF retained for direct reference. Do not attribute any specific numerical rule to this link until the page is inspected.